The project involved the extension of an office building located just a few steps from Castel Sant’Angelo, through the construction of a new floor of approximately 200 m² using a dry-assembled steel structure. At the same time, the intervention lightened the overall volume of the building by removing slabs and accumulated materials that had weighed it down over time, restoring a more slender and harmonious character in contrast to the compositional variety typical
of 1970s architecture. The project also includes the installation of an elevator with dedicated access, while the overall restyling began with the entrance hall and will progressively extend to the upper floors.
External collaborators: Structural engineers VB Ingegneri Associati
CLICK ON THE LEFT AND RIGHT OF THE DRAWING TO NAVIGATE
The project involved the extension of an office building located just a few steps from Castel Sant’Angelo, through the construction of a new floor of approximately 200 m² using a dry-assembled steel structure. At the same time, the intervention lightened the overall volume of the building by removing slabs and accumulated materials that had weighed it down over time, restoring a more slender and harmonious character in contrast to the compositional variety typical
of 1970s architecture. The project also includes the installation of an elevator with dedicated access, while the overall restyling began with the entrance hall and will progressively extend to the upper floors.
External collaborators: Structural engineers VB Ingegneri Associati
CLICK ON THE LEFT AND RIGHT OF THE DRAWING TO NAVIGATE